•  Retrait gratuit dans votre magasin Club
  •  7.000.000 titres dans notre catalogue
  •  Payer en toute sécurité
  •  Toujours un magasin près de chez vous     
  •  Retrait gratuit dans votre magasin Club
  •  7.000.000 titres dans notre catalogue
  •  Payer en toute sécurité
  •  Toujours un magasin près de chez vous
  1. Accueil
  2. Livres
  3. Sciences humaines
  4. Sciences
  5. Technique
  6. Implementation of Line of Balance in bridge project

Implementation of Line of Balance in bridge project

Amit Sharma, Vikas Sharma
Livre broché | Anglais
39,45 €
+ 78 points
Livraison sous 1 à 4 semaines
Passer une commande en un clic
Payer en toute sécurité
Livraison en Belgique: 3,99 €
Livraison en magasin gratuite

Description

Line of Balance (LOB) is a management control process for collecting, measuring and presenting facts relating to time all measured against a specific plan. It shows the process, status, background, timing and phasing of the project activities, thus providing management with measuring tools that help to Comparing actual progress with a formal objective plan and examining only the deviations from established plans, and gauging their degree of severity with respect to the remainder of the project. The LOB itself is a graphic device that enables a manager to see at a single glance which activities of an operation are "in balance" - i.e., whether those which should have been completed at the time of the review actually are completed and whether any activities scheduled for future completion are lagging behind schedule. CPM is continuously used in India for network analysis and finding critical path, Problem is taken as challenge to introduce and the new technique named linear scheduling which is proved better than CPM for repetitive construction works.

Spécifications

Parties prenantes

Auteur(s) :
Editeur:

Contenu

Nombre de pages :
60
Langue:
Anglais

Caractéristiques

EAN:
9783659807428
Format:
Livre broché
Dimensions :
150 mm x 220 mm

Les avis