•  Retrait gratuit dans votre magasin Club
  •  7.000.000 titres dans notre catalogue
  •  Payer en toute sécurité
  •  Toujours un magasin près de chez vous     
  •  Retrait gratuit dans votre magasin Club
  •  7.000.0000 titres dans notre catalogue
  •  Payer en toute sécurité
  •  Toujours un magasin près de chez vous

Rov '86: Remotely Operated Vehicles

Technology Requirements--Present and Future Proceedings of the Rov '86 Conference Organized by the Marine Technology Society, the Society for Underwater Technology and the Association of Offshore Diving Contractors and Held in Aberdeen, Uk,24--26 June 1986

Robert L Wernli, Roger Chapman
Livre relié | Anglais
223,95 €
+ 447 points
Livraison 1 à 2 semaines
Passer une commande en un clic
Payer en toute sécurité
Livraison en Belgique: 3,99 €
Livraison en magasin gratuite

Description

There is now an awareness within the industry, particularly as oil companies direct considerable resources towards developing diverless production systems, that a fully integrated approach to equipment design and intervention is necessary to achieve an acceptable system. The requirement for an integrated approach to equipment design and intervention is applicable not only to diverless depths but to all subsea structures, equipment and intervention techniques in whatever depth. Fortunately the inherent dexterity of the diver does not impact so severely on design as other intervention techniques. However the benefits of an integrated approach are still applicable and the use of such simple "diver aids" as cutting guides and subsea markings installed prior to the installation of jackets and subsea equipment can have a significant impact on the cost of intervention. This paper examines the requirements and limitations in designing subsea equipment for Remotely Operated Vehicle (ROV) intervention. For the oil company embarking on the development of a diverless production system, be it totally diverless because of the envisaged water depth or primarily diverless with the possibility of diver back up, the intervention techniques adopted will strongly influence the final system design. The necessity to undertake an extensive development programme to produce the optimum intervention system is very costly, requires long lead times and comprehensive testing particularly where novel solutions are adopted. It is a daunting prospect for even the most progressive of oil companies.

Spécifications

Parties prenantes

Auteur(s) :
Editeur:

Contenu

Nombre de pages :
366
Langue:
Anglais

Caractéristiques

EAN:
9780860108153
Date de parution :
30-06-86
Format:
Livre relié
Format numérique:
Genaaid
Dimensions :
210 mm x 297 mm
Poids :
1253 g

Les avis

Nous publions uniquement les avis qui respectent les conditions requises. Consultez nos conditions pour les avis.