•  Retrait gratuit dans votre magasin Club
  •  7.000.000 titres dans notre catalogue
  •  Payer en toute sécurité
  •  Toujours un magasin près de chez vous     
  •  Retrait gratuit dans votre magasin Club
  •  7.000.000 titres dans notre catalogue
  •  Payer en toute sécurité
  •  Toujours un magasin près de chez vous

Guidelines to Minimize Downtime During Pipe Lining Operations

Thomas D Rockaway, R Timothy Ball, Terrance M Brueck, Penny Brink, Theo Hoven
Livre broché | Anglais | Water Research Foundation Report
177,45 €
+ 354 points
Livraison sous 1 à 4 semaines
Passer une commande en un clic
Payer en toute sécurité
Livraison en Belgique: 3,99 €
Livraison en magasin gratuite

Description

When repair and rehabilitation of existing infrastructure is necessary, many utilities employ techniques that reuse the existing conduit to reduce the impact to customers, existing surface facilities, and traffic flow. Pipe renewal operations are generally less expensive and less disruptive than open trench replacement; however, customers must still endure service disruptions and general construction environments. While infrastructure improvements ultimately benefit customers in the long-term, utilities benefit when they reduce short-term customer dissatisfaction. Repair and maintenance of existing distribution lines is an increasing concern for utilities. While pipe lining activities are effective and generally less expensive than complete replacement, they still represent considerable time and expense.
The purpose of this research was to provide guidance on the best practices to minimize the downtime associated with pipe lining operations. In this context, "downtime" refers to the amount of time customers are without water service, must endure restricted service, or are served by less secure networks. Minimizing the amount of downtime and improving temporary service will have a direct impact on customer satisfaction and costs. The data collection from the selected utilities during this project suggested that a number of best management practices have the potential to reduce the length of time necessary for pipe lining operations and consequently, the length of time a temporary pipeline is in service. Each recommended management practice would require a shift or change in what is currently considered a typical construction practice. The construction processes recommended have the potential to significantly reduce the number of days or weeks most customers are subjected to maintenance activities and the temporary pipeline.

Spécifications

Parties prenantes

Auteur(s) :
Editeur:

Contenu

Nombre de pages :
164
Langue:
Anglais
Collection :

Caractéristiques

EAN:
9781843398356
Date de parution :
01-11-07
Format:
Livre broché
Format numérique:
Trade paperback (VS)
Dimensions :
210 mm x 279 mm
Poids :
385 g

Les avis